Blast-furnace slag for cement blending: form, fineness and the brief

How to brief a blast furnace slag supplier for slag cement: one laitier form per offer, fineness, moisture and maritime stowage. A generic slag quote is not an offer.

14 min readBruno Brahim Ghezali

To brief blast-furnace slag for a cement blend, name one form in the first line and keep every later line attached to it. Ground powder and unground granule are different cargoes, different mill instructions and different disputes. The brief then says which path the mill will run, intergrind or blend from a separate silo, the fineness or the size by the method the receiving laboratory already uses, whether the weight is wet or dry, and how the slag will sit in the hold. A line that only says slag comes back as a question. It is not a price, and it is not a quotation a mill should accept.

The abbreviations GBFS, GGBS and GGBFS, and the difference between ground slag and coarser unground slag, are set out in GBFS, GGBS and laitier. This note does not rebuild that distinction. It is the buying brief on the GBFS line: one laitier form per offer, the fineness the finish mill can dose, moisture, and maritime stowage.

In French correspondence laitier means the slag constituent, not the finished cement, and it still leaves ground and unground unstated. We answer with the form. If the purchase is already ground, already blended, sulphated and sold as cement, that file is cement. The ship in this note arrives as slag. The mill still blends, sulphates and tests.

What you decide here

  • Form in the offer: one solid, ground or unground, so the blend silo and the hold are built for the same cargo.
  • Fineness the finish mill can dose, by the method the receiving lab uses, or the size of the granule when the mill will grind.
  • Moisture as the weight basis and as the limit on what that silo can still move.
  • Stowage for that form, including the previous cargo and the gear that will actually discharge it.
Name one form per offer in the first line of the trade inquiry. A generic slag quote will come back as a question.

One form, one offer

Two forms in one offer are two cargos. Ground powder and unground granule do not share a silo instruction, a cubic figure, a sampling plan or a dispute. A mill that can take either may run two qualifications in parallel. They stay two files. The seller does not choose the form on the day of loading.

Picture the blend silo on the morning the ship works. The board names one product. The feeder is set for a powder the separator already knows, or the mill is waiting for a granule it will grind on its own circuit. Moisture in the mass, and whatever the previous cargo left on the steel, decide whether that slag is still doseable. A full hold does not answer that. The form does.

Who grinds sets the form before freight. Spare finish-mill time, or a circuit kept for slag, usually means the granule. The buyer makes the fineness, so the brief locks size, dust and moisture. A mill that is already full, or a station that draws ground materials from separate silos, wants the powder. Fineness is then a contract condition, and the grinding happened before the bill of lading. The silo was built for one solid.

Change the form after the ship is fixed and a passed sample becomes a cargo the plant cannot dose. The recap names the form in words a silo operator can read, and the invoice uses the same words. Slag in bulk is too thin when the argument is powder versus granule. A coarser form keeps the coarser name. If the pile is unground granule and the email asked for powder, we do not rename it. Either the grind is done to your method and that ground lot is what we sample, or we name the form that exists and you decide whether the mill can take it.

One lot, one quality, inside that form. Topping a short granule cargo with another pile, or joining two grinding campaigns to fill a stem, makes a new product. Agree it before loading, sample the combined lot, and describe it as such. The grab cannot unmix it. Laitier means the constituent, not finished cement, and it still leaves ground and unground unstated. Laitier granulé only points away from air-cooled lump. We reply with the form. The abbreviations stay in the sibling note.

A slag cargo with no blend, no fineness and no discharge cannot be priced. NAGTAR qualifies Algerian supply against the form you named, with selected partners. Granulation and grinding are campaigns. A coarser pile keeps the coarser name until that grind has been sampled.

Fineness the finish mill can dose

Fineness is locked when the cargo is ground. State the method and the target the finish mill can dose. Mills speak in Blaine, in residue on a named sieve, or in a particle-size curve. Those are not the same measurement. A Blaine figure with no method, and no word on whether it is a minimum or a band, can pass on a sheet and fail at the separator. Fine is not a method. The test on the certificate has to be the test in the contract.

Say what a miss means before the ship is fixed: a rejection, a price conversation, or a trial the mill will still run. A coarse tail blinds a separator and hangs in a silo cone even when the mean looks acceptable. If the plant rejects on residue, put the sieve in the first brief.

Doseability is also handling. Too coarse, and the feeder starves or the silo will not empty. Too fine and too dry, and the powder floods a filter and will not sit in a weigh hopper. Name that failure in the language of your equipment.

When you buy the granule and grind it yourself, fineness is your result. A Blaine target on an unground cargo is a test the lot cannot pass, because nobody has ground it yet. State the size range, the limit on oversize lumps, and the limit on dust you do not want to lose at the grab. Rehandled granule can carry more fines than a fresh granulator pile. Sample the pile that will be loaded, not an old datasheet.

Glass content and activity stay on the qualified lot. Say whether you have a minimum glass content, by which method, and whether a miss rejects the stem. Say whether activity is a contract test or a mill trial after discharge, and at which ages. Early strength and the later age your customers buy on do not move together. An activity line with no age and no laboratory is not a test.

Chemistry is the list of limits you already enforce: CaO, SiO2, Al2O3, MgO, sulphide, sometimes chloride or alkali. Magnesia and sulphide are where blends diverge, acceptable beside one clinker and awkward beside another. We match your limits to the lot. NAGTAR does not publish a standing assay. Where a result does not exist, the offer says so. A different grind on a later stem is retested.

Moisture and how slag sits in a hold

Moisture is a specification and a weight clause. With the previous cargo, it decides whether the slag in the hold is still doseable in the blend silo. Chemistry can match the sample. Water can still stop the feeder on the morning you need the slag.

Granule holds water in the pores. The pile can look free and still carry water the mill must drive off, or water you pay for if the contract is silent. Powder takes water from an open hatch, from condensation on cold steel, or from a damp tank top left by the previous cargo. Wet powder cakes. Caked powder does not meter. The lot on the certificate and the lot the silo can dose have parted company.

State whether the weight is wet or dry, how moisture is sampled, and what happens above the ceiling. A draft survey is the mass in the ship. On a dry basis it becomes dry tonnes only with a moisture result both sides trust. Write the rule before loading: where increments are cut, how the composite is split, which laboratory runs the test, and which result governs the invoice. A grab from the top of the pile will not survive a discharge argument. On a wet basis you still need a ceiling. Above it you are paying for water, or you are holding a rejection you wrote down. About normal has no oven and will not close that gap.

The laboratory sample is often drier than the edge of the pile and drier than a hold that took spray. Water sits against bulkheads, under hatch coamings and on the tank top. Say whether the mill can dose that fraction, set it aside, or whether a result above the ceiling rejects the stem. A blend silo with no spare space cannot park a wet pocket. Close the hatch in rain and stop an open grab. A closed spout does not dry slag that was loaded wet.

The Incoterm does not name the oven. FOB, CFR and CIF allocate the ship, the freight and, under CIF, a stated insurance. Agree draft survey, belt scale, or both, and which figure the invoice uses. A draft with no moisture correction is a wet weight. Looking dry is not a method. If both a loading result and a discharge result are allowed, name the one that governs.

Arrival is not a CEM III

The hold discharges slag. A slag cement, including types in the CEM III family, is a finished binder the mill has already ground or blended, sulphated and tested. That work uses the mill's clinker, sulphate and customers. The bill of lading does not do it. A good sample of the constituent does not do it either.

Use this cargo in a blend the plant controls. Intergrinding clinker, a sulphate source and slag is one path. Blending ground slag with cement, or with separately ground clinker, is the other. Say which path you will run. A powder for a blender can be the wrong feed for a mill that expected a granule. A granule is useless where no mill is left to run.

The blend ratio is yours. We do not publish a replacement rate. We qualify the lot against the quality book you already apply. A rate from another clinker and another sulphate stays with that plant.

Sulphate balance stays at the mill. Slag changes the gypsum the cement needs. We do not prescribe the rate. A blend trial with no sulphate check is incomplete. Early strength and the later age can move apart. Colour and heat can reject a lot on their own: a pale cement will refuse a darker slag, and mass concrete may want the slower heat. If shade is only a preference, say so before the hatch opens.

Finished binder is its own file. We look at cement. Type, strength class and packing belong there. The two purchases can share a company. They do not share a hold, a certificate or a price. Calling the discharged slag a cement leaves a product the standard has not certified.

Natural pozzolan can replace part of the clinker in some plants. It is specified and it reacts on its own terms, as set out in pozzolan in cement. The choice belongs in the brief. A short slag pile does not licence a swap at the hatch. Air-cooled slag sold as aggregate can leave a blast furnace and still be the wrong feed. The glass is what later reacts. Crystallised rock does not regain it because the offer says slag. Fly ash and limestone filler are further additions. If the standard allows several, the shipment names one.

Your cement will carry your name, so the lot traces to the pile that was tested. A later campaign is qualified again. Arrival is where the mill blends, sulphates and tests.

Stowage, contamination and the previous cargo

Stowage follows the form. Powder and granule do not occupy the same space per tonne, and a wetter granule changes it again. We keep no house factor called slag. The ship and the receiver's gear decide spout, grab or belt. Powder on a grab-only ship is a dust claim. Granule into a silo with no screen is a lump claim. Write the gear on this berth.

Previous cargo decides doseability together with moisture. Chloride, sugar, a fertiliser film, or another residue your standard treats as a contaminant, is a reason to refuse the ship. Inspect before loading. A clean certificate from another trade does not wash the steel. Say who inspects and what residue rejects the hold. The slag can be the right form and the right fineness, and still take up what the last cargo left in the bilges and on the tank top. Once that residue is through the mass, the blend silo has one product, and it is no longer the sample. Refuse the ship before loading.

Do not top up a short granule parcel with ground slag so the ship sails full. The grab cannot separate them. Two forms on one vessel mean two holds and two sampling regimes. Two forms in one offer were already two cargos. Two forms in one hold are one mixed cargo, and the silo will dose the mix. Clinker can share a programme with slag. It should not share the hold.

Bags and big bags suit a trial, or a plant that cannot take bulk, qualified as their own lot. A sound container does not license the next bulk stem. The bag may have been dried. The pile may not. Blend supply of this kind moves in bulk. This page states no tonne band. Name the tonnes once form, moisture and discharge are real.

Load port, rate and laycan sit in the recap with the form. Algeria is not one berth. Nominate tonnage after that recap, not before it. The certificate names ground or unground granulated blast-furnace slag, plus the fineness or size method. Moisture is reported when it corrects the weight or can reject the lot. Glass and activity appear only if those tests were run. A blank beats a figure taken from another campaign. Sampling at loading, a sealed split and a named referee sit with the hold inspection. FOB, CFR and CIF allocate the ship, the freight and, under CIF, insurance. None of them chooses the form or the previous cargo.

The brief that can be priced

A price on an unnamed form is a number neither side can defend. Send the brief first. The price conversation starts when the lot and the form are the same thing. If you can take either form, send two briefs. Mark a blank line as open. A guessed line becomes a specification the silo has to live with.

  • Form: one only, ground powder or unground granule, in words. If you can accept either, say so and expect two paths.
  • Mill path: intergrind with clinker and a sulphate source, or blend from a separate silo. Name the cement or the standard you sell, and the slag share the quality book already allows.
  • Fineness or size: method, target, and what a miss means. For powder, say whether the coarse tail rejects the lot. For granule, lock lumps and dust, and leave Blaine to your own grind.
  • Moisture: wet weight or dry weight, the ceiling, where increments are cut, which laboratory runs the test, and which result governs.
  • Chemistry limits you already apply. Say whether glass or activity is a contract test or a later mill trial, and at which ages.
  • Volume and rhythm: the tonnes of this shipment, one stem or a monthly intake. Trial tonnes are a different lot from the first full hold.
  • Discharge: silo, grab, spout or belt, the rain constraint, and what the plant does with a wet pocket.
  • Previous cargo: what residue rejects the ship, and who inspects the hold before loading.
  • Incoterm, load-port ideas if you have them, and whether the invoice weight is draft or scale.
  • Dates: when the mill can receive, and the date a sample result stops being useful.

If you also need clinker or finished cement, put that need in the same message as its own block. If you are choosing between slag and pozzolan, say so before the wrong powder is sampled. The offer stays indicative while the form is optional, moisture is unwritten, or inspection is not appointed. A firm offer is one form, one lot and a discharge you can run.

Questions the brief still opens

Why will you not quote slag without a form?

The word covers two cargoes a mill cannot swap at the hatch. Ground powder and unground granule differ in fineness, in how they hold water, and in the gear that discharges them. One price on slag hides which solid will be loaded. We quote one form per offer. Two forms in one offer are two cargos. Ask for two offers if you need both.

Does fineness belong in the first brief?

Yes, when you are buying powder. Name the method, whether the target is a minimum or a band, and whether the coarse tail can reject the lot. When you are buying granule to grind yourself, fineness is your mill's result. Lock size, dust and moisture instead. A Blaine figure on unground slag is a test nobody has prepared the cargo to pass. A coarser form keeps its coarser name.

How should moisture be handled on a bulk cargo?

Fix wet weight or dry weight before the ship, and write the ceiling the mill can still dose. Dry weight needs a sampling rule and a laboratory, so the draft survey can be corrected. Wet weight still needs that ceiling. Granule holds water in the pores. Powder takes up rain or a damp hold and then cakes. A blend silo with no spare space cannot park a wet pocket. Bulk and the Incoterm leave this open.

Can one shipment mix slag and cement?

Keep them out of the same hold. Slag for blending and finished cement are different products. Cement is quoted as cement. Slag is one form on the slag line. Discharge is still slag. The mill blends, sulphates and tests before anyone can treat the powder as a CEM III. One bill of lading for both sends the wrong solid to the wrong silo.

Is pozzolan an acceptable stand-in on a slag offer?

No. A plant may choose pozzolan, and some standards allow either, but the choice is made in the brief. Pozzolan is qualified on its own terms in pozzolan in cement. Loading it because the slag form was short changes the trial, the activity test and the dosage together. Air-cooled aggregate, fly ash and limestone filler are different cargoes as well.

What does a supplier need before naming a ship?

The form, the fineness or size method, the moisture basis, the tonnes of this shipment, the discharge limit, the previous-cargo standard and the Incoterm. With those we can say whether an Algerian lot can be qualified and whether the ship type makes sense. Without them a named ship is a guess about the hold and about what the grabs will pick up. The ship follows the lot.

For Buyers

Discuss a related trade requirement

Share your product, volume and destination with the trading team.

For Suppliers

Algerian producer on this line?

If you manufacture or supply related products, apply as a supply partner.